JPR Environmental
Tel: 01453 822584
Email: jpr@jprenvironmental.co.uk
Home About us Site search Case studies Client list Contact us
Our Core Services:
Wetland creation
Newt fencing
Erosion Control
Ecological Contracting
Reedbed management
Site preparation
Japanese Knotweed
  • wetlands.gif
  • site.gif
  • reedbeds.gif
  • erosion.gif
  • protected.gif
  • contracting.gif

 
 

Water treatment system at Steart Marshes visitor centre

 

The Steart Marshes nature reserve is an innovative response to dealing with the squeeze on wildlife along the coasts in the UK - read more about it here: Wetland Reserve - Steart Marshes.

The Wildfowl & Wetlands Trust (WWT) are managing the nature reserve and visitor centre at Steart but this comes with its own challenges. The visitor centre needs toilet facilities but whilst there is water into the site, there is no facility to take foul water away from the site.

JPR were contracted by WWT to develop a suitable water treatment system for the effluent from the public toilets.

The system developed runs through a vertical flow bed with a recycled glass media to a swale and pond system. The final treatment of the waste water is via a willow bed.

The solution is working very well and has the following advantages:

  • energy use is low
  • it is natural-looking and in-keeping with the surroundings
  • the use of native plants encourages biodiversity
  • the water is treated to a high quality
  • everything is kept on site which means that no local sewage system is necessary

The solution also means that no soakaway is necessary which has avoided the potential problem of waste water leaching into the local ditch network.

JPR has achieved the aim of a low energy, natural sewage treament system and the clients are very happy with the result.

 

Call us on 01453 822584 or email us with your water treatment enquiry.

 

  Steart Marshes starting work on the water treatement system for the Environment Agency and The Wildfowl & Wetlands Trust
 

Starting work on the water treatment system

 

  Steart Marshes laying the pipework for the water treatment system for the Environment Agency and The Wildfowl & Wetlands Trust
  The pipework for the water treatment system begins to take shape
  Steart Marshes installing the pumping station for the Environment Agency and The Wildfowl & Wetlands Trust
 

Installing the pumping station

 

Call us on 01453 822584 or email us with your pond creation or mitigation enquiry.

We have extensvie experience of water treatment systems including installing, managing and planting reedbeds, installing and retro-fitting SuDS systems and willow treatment beds. Our staff have worked on water treatment systems of all sizes.

  wildlife logo cwa logo CHAS ISOQAR - UKAS

Cert No. 12024
ISO 9001
ISO 14001

Search bubble: bioengineering, build, conservation, construction, wetland, design, JPR Environmental, landscaping, reedbed, river, wildlife, Habitat, surveying, Ecological, Contractors, Erosion control, reeds & reedbed management, wetland management, aquatic plant supply, wildlife landscaping, protected species work.